|
Year
|
Product
|
Barge/Project
|
Customer
|
|
1974
|
Manufacturing
of three 60 tons pipe tensioners |
Castoro
Sei |
SAIPEM
(Italy) |
| 1974
|
Manufacturing
of one line-up station |
Castoro
Sei |
SAIPEM
(Italy) |
|
1974
|
Manufacturing
of two pipe lifting systems |
Castoro
Sei |
SAIPEM
(Italy) |
| 1974
|
Manufacturing
of the internal ramp handling system |
Castoro
Sei |
SAIPEM
(Italy) |
| 1975
|
Manufacturing
of ramp rollers |
Castoro
Sei |
SAIPEM
(Italy) |
| 1984
|
Manufacturing
of two 45 tons pipe tensioners |
Castoro
Due |
SAIPEM
(Italy) |
|
1988
|
Manufacturing
of two 68 tons pipe tensioners |
Israfil
Guseinov |
Rauma
Repola (Finland) |
| 1990
|
Modification
of three existing 68 tons hydraulic pipe tensioners and one
A/R winch manufactured by Western Gear (conversion from hydraulic
to electrical driving system) |
Semac
I |
EMC
(England) |
|
1992
|
Manufacturing
of two 30 tons pipe tensioners |
Castoro
Dieci |
EMC
(England) |
| 1993
|
Upgrade
of 64 tons pipe tensioners to 110 tons capacity
|
Castoro
Sei |
EMC
(England) |
|
1993
|
Supply
of two pipe tracks for the firing line |
Castoro
Sei |
EMC
(England) |
| 1994
|
Strengthening
of the external ramp handling system up to 1.000 tons capacity
|
Castoro
Sei |
EMC
(England) |
|
1994
|
Manufacturing
of two pipe rollers and two stern rollers for ramp extension
|
Castoro
Sei |
EMC
(England) |
| 1994
|
Strengthening
of the external ramp booms up to 1.000 tons capacity
|
Castoro
Sei |
EMC
(England) |
|
1994
|
Manufacturing
of one 40 tons pipe tensioner |
ODS
Mariner |
Rana
(Italy) |
| 1994
|
Manufacturing
of two 40 tons pipe tensioners |
Various
|
GMC
(USA/UK) |
|
1994
|
Manufacturing
of one 80 tons A/R winch |
Various
|
GMC
(USA/UK) |
| 1995
|
Strengthening
and automation of the line-up station |
Castoro
Sei |
EMC
(England) |
|
1996
|
Strengthening
of two 68 tons pipe tensioners |
Israfil
Guseinov |
AIOC
(Azerbaijan Rep.) |
| 1996
|
Strengthening
of one 160 tons A/R winch |
Israfil
Guseinov |
AIOC
(Azerbaijan Rep.) |
|
1997
|
Design
and manufacturing of a subsea diverless system
|
|
SNAM
(Italy) |
|
1997
|
Supply
of an integrated pipe-lay system consisting of three 40 tons
pipe tensioners and one 120 tons A/R winch |
Semac
I |
EMC
(England) |
|
1997
|
Basic
engineering for transformation in S and J-Lay vessel
|
SAIPEM
7000 |
SAIPEM
(Italy) |
| 1997
|
Manufacturing
of one 60 tons pipe tensioner |
Castoro
Dieci |
EMC
(England) |
|
1997
|
Manufacturing
of one 100 tons A/R winch |
Castoro
Dieci |
EMC
(England) |
| 1998
|
Supply
of two 25 tons pipe tensioners and one 50 tons A/R winch
|
Yamashiro
|
Van
Oord (The Netherlands) |
|
1998
|
Supply
of one 60 tons pipe tensioner and one 60 tons A/R winch
|
Java
Constr. |
Clough
(Australia) |
| 1998
|
Supply
of three 175 tons pipe tensioners |
SAIPEM
7000 |
SAIPEM
(Italy) |
|
1998
|
Basic
design |
SAIPEM
7000 |
SAIPEM
(Italy) |
| 1998
|
DJ
Nesting System |
Semac
I |
EMC
(England) |
|
1999 |
Pipe
tensioner squeeze system upgrade |
Castoro
Sei |
EMC
(England) |
| 1999
|
Basic
design for FDS project |
FDS
|
SAIBOS
(France) |
|
1999
|
Design
and manufacturing of a Firing Line System |
FDS
|
SAIBOS
(France) |
| 1999
|
Supply
of two 40 tons pipe tensioners |
Lone
Star |
HORIZON
OFFSHORE (Usa) |
|
From
1990
to
2000
|
Supply
of tens of internal line up Clamps from 6" to 48"
electrical or pneumatic driver
|
|
SAIPEM
GROUP |
| 2000
|
Supply
of one 25 tons pipe tensioners, one 50 tons A/R Winch, line-up
system and firing line rolles |
SAIBOS
230 |
SAIBOS
(France) |
|
2000
|
Supply
of one 40 tons pipe tensioners |
Gulf
Horizon |
HORIZON
OFFSHORE (Usa) |
| 2000
|
Design
and manufacturing of different size and Lay configuration
ILUCs |
SAIPEM
7000 |
SAIPEM
(Italy) |
|
2000
|
Manufacturing
of two 4 tracks 90 tons pipe tensioner |
FDS
|
SAIBOS
(France) |
| 2000
|
Manufacturing
of one overhead welding carousel |
FDS
|
SAIBOS
(France) |
|
2001
|
Supply
of two tons pipe tensioners, one 50 tons A/R Winch, line up
system and firing line rolles |
Pecos
Horizon |
HORIZON
OFFSHORE (Usa) |
| 2001
|
Manufacturing
of one welding carousel |
SAIPEM
7000 |
SAIPEM
(Italy) |
|
2001
|
Manufacturing
of two 80 tons pipe tensioner, one 180 tons A/R winch and
firing ramp track supports |
Abuzar
|
IOEC
(Iran) |
| 2001
|
Design
and manufacturing of a 24” 60 Tons Anode clamp
|
SAIPEM
7000 |
SAIPEM
(Italy) |
| 2002 |
Feasibility
study for installations of S-Lay system |
SAIPEM
7000 |
SAIPEM
(Italy) |
| 2002 |
Feasibility
study for the Manufactoring of 400 tons capacity pipe Tensioners
|
SAIPEM
7000 |
SAIPEM
(Italy) |
| 2002 |
Design and manufactoring of No.23 radio controlled Internal
line-up clamps from 8" to 28" for J-Lay and Double
Joint |
Balder |
HEEREMA (Holland) |
|
2002 |
Modification oj No.4 Pennant Wire Winches |
Castoro Sei |
SAIPEM (Italy) |
|
2002 |
Supply of new umbilical ystem for Inernal line up clamps
|
Semac
I |
SAIPEM
(Italy) |
|
2002 |
Supply
of new umbilical ystem for Inernal line up clamps
|
Castoro
Sei |
SAIPEM
(Italy) |
|
2002 |
Renew
of Internal ramp handling system with HPP |
Castoro Sei |
SAIPEM (Italy) |
|
2002 |
Design
and manufacturing of No. 2 Internal line up clamps 30”-32”
umbilical driven |
|
NPCC
(Uae) |
|
2002 |
Manufacturing
of two 90 tons pipe Tensioner, one 180 tons A/R winch A/C
driven |
ISRAFIL
GUSEINOV |
McDERMOTT/AIOC
(Azerbaijan)
|
|
2003 |
Modification
of no. 1 Tensioner REMACUT 40 tons and no. 1 Carmoy A/R Winch
with supply of integrated control system |
Castoro
Sei |
SAIPEM
(Italia) |
|
2003 |
Supply
of a Load, Speed, footage measuring system for Anchor Winches
|
Abouzar
1200 |
IOEC
(Iran) |
|
2003 |
Supply
of no. 4 radio controlled Internal line up clamps
|
Balder
|
HEEREMA
(Holland) |
|
2003 |
Modification
of Pipe handling Equipment system |
ISRAFIL
GUSEINOV |
MCDERMOTT/
AIOC (Azerbaijan) |
|
2003 |
Supply
of a Inert material handling system |
Castoro
Sei |
SAIPEM
(Italy) |
|
2004 |
Manufacturing
of two 75 tons pipe Tensioner, one 180 tons A/R winch A/C
driven |
PLBG136
|
SADRA
(Iran) |
|
2004 |
Manufacturing
of Umbilical Winches |
PLBG136
|
SADRA
(Iran) |
|
2004 |
Tensioner
& A/R Winch Control System Upgrade |
Castoro
Otto |
SAIPEM
(Italy) |
|
2004 |
Manufacturing
of one 60 ton pipe Tensioner |
|
MICOPERI
(Italy) |
|
2004 |
Manufacturing
of No. 4 Pipe Davits |
Tofiq
|
MCDERMOTT
(Azerbaijan) |
|
2004 |
Manufacturing
of No1 Launch and Recovery System (LARS) for Divers
|
Tofiq
|
MCDERMOTT
(Azerbaijan) |
|
2004 |
Manufacturing
of No1 Launch and Recovery System (LARS) for ROV
|
Tofiq
|
MCDERMOTT
(Azerbaijan) |
|
2004 |
Design
and manufacturing of a Pipe Handling System |
SB270
|
SAIBOS
(France) |
|
2004 |
Supply
of a Stinger Jacking System Upgrade |
ISRAFIL
GUSEINOV |
MCDERMOTT/
AIOC (Azerbaijan) |
|
2004 |
Supply
of a Stinger Winch |
ISRAFIL
GUSEINOV |
MCDERMOTT/
AIOC (Azerbaijan) |
|
2004 |
Supply
of new Tensioners and A/R Winch Control system
|
Castoro
Sei |
SAIPEM
(Italia) |
|
2004 |
Basculante
system refurbishment and upgrade |
Castoro
Sei |
SAIPEM
(Italia) |
|
2004 |
140
tons pipe track support |
Castoro
Sei |
SAIPEM
(Italia) |
|
2004 |
50
tons pipe elevator refurbishment and upgrade
|
Castoro
Sei |
SAIPEM
(Italia) |
|
2004 |
Cranes
electrical upgradinf including new load measuring system
|
Castoro
Sei |
SAIPEM
(Italia) |
|
2004 |
Supply
of Internal Line Up Clamps equipped with a new generation
closed circuit inspection camera |
Castoro
Sei |
SAIPEM
(Italia) |
|
2005 |
Manufacturing
of four 120KN Capstan Mooring winches |
Derrick
Barge Azerbaijan |
SAIPEM
(Azerbaijan) |
|
2005 |
2500
tons Crane upgrade |
Derrick
Barge Azerbaijan |
SAIPEM
(Azerbaijan) |
|
2005 |
Manufacturing
of two 60 tons pipe Tensioner, one 120 tons A/R winch A/C
driven |
DLB332
|
GLOBAL
IND. (Usa) |
|
2005 |
Manufacturing
of one 60 tons pipe Tensioner, one 60 tons A/R winch A/C driven
|
PLB
|
PUNJ
LLOYD (India) |
|
2005 |
Supply
of new DC drives unit for Barge main Crane |
DLB
750 |
NPCC
(Uae) |
|
2006 |
Manufacturing
of two 125 tons pipe Tensioners, one 250 tons A/R Winch A/C
driven |
DLB
750 |
NPCC
(Uae) |
|
2006 |
Supply
of Firing Line Handling Equipment |
DLB
750 |
NPCC
(Uae) |
|
2006 |
Supply
of new control system for no. 8 Skagit Winches
|
CASTORO
8 |
SAIPEM
(Indonesia) |
|
2006 |
Supply
of new Firing Line System |
FDS
|
SAIPEM
SA (France) |
|
2006 |
Manufacturing
of no. 1 each 90 tons pipe Tensioner 4 tracks
|
Normand
Cutter |
SONSUB
(UK) |
|
2006 |
Supply
of no. 2 each 125 tons cap. pipe Tensioners AC driven
|
DB30
|
MCDERMOTT
(Australia) |
|
2006 |
Supply
of no. 1 each pipe Tensioners 60 tons cap. |
|
Z&P
(Venezuela) |